Infrastructure & Utilities

As-built drawings, inspection reports and maintenance logs, tied to the right asset.

Discuss a digitization challenge
Aerial view of a cable-stayed bridge over a wide river in Ho Chi Minh City, in morning haze

One asset, years of documents

Drawings, permits, inspections and maintenance records, made by different teams over many years.

Sample asset

Under all that paper is one real thing in one place. The goal is one asset record whose documents, place and history stay connected.

Five kinds of records behind one asset

Each kind comes from a different team, in its own format.

  1. Two engineers in hard hats checking a curved concrete overpass from a walkway
  2. A stack of black ring binders
  3. An inspector in a hard hat and safety vest holding a clipboard
  4. An open box of old file cards and folders
  5. Drawn for this page: an as-built drawing sheet of a two-tower cable-stayed bridge
  1. Record 1 of 5

    Field photos and sketches

    Site photos, network diagrams and marked-up sketches.

  2. Record 2 of 5

    Asset registers

    Asset lists and equipment registers, in mixed formats.

  3. Record 3 of 5

    Inspection and service notes

    Inspection and service notes gathered over the asset's life.

  4. Record 4 of 5

    Logs and handover files

    Operating logs and handover packages from finished projects.

  5. Record 5 of 5

    Drawings and permits

    Design drawings, as-built records and issued permits.

What makes it hard

Five hard problems on one drawing

  1. Problem 1 of 5

    Many documents for one asset

    Each change adds a revision, and each team adds its own papers over the years.

  2. Problem 2 of 5

    Codes that change or disagree

    The same asset can carry different codes in different systems, periods and contracts.

  3. Problem 3 of 5

    Facts in drawings, tables and text

    The same fact can sit in a drawing, a table or a paragraph.

  4. Problem 4 of 5

    The right asset for each document

    Linking each document to the correct asset is the hard part.

  5. Problem 5 of 5

    Place and network

    Each asset must sit in the right place and the right network.

Drawn for this page: an as-built drawing sheet of a two-tower cable-stayed bridge, with a pier plan, a table, notes, a title block and a location plan

What you get

One record for the whole asset

  1. Output 1 of 4

    One asset record

    One record for each asset, built from all its source documents.

  2. Output 2 of 4

    Asset, place, papers, events

    Clear links between the asset, where it is, its documents and what happened to it.

  3. Output 3 of 4

    Ready for asset and map systems

    Technical data packaged for asset management, map systems and analysis.

  4. Output 4 of 4

    Conflict reports

    Reports that list conflicts, duplicates and missing links.

A cable-stayed bridge with two towers over a river at sunset, the city behind it
  1. 01Drawings
  2. 02Permits
  3. 03Asset register
  4. 04Inspections
  5. 05Maintenance
  6. 06Field photos

6 kinds of records, one asset.

A cable-stayed bridge tower and its cables against a blue skyAerial view of a road interchange whose ramps cross a riverTwo engineers in hard hats checking a concrete overpass from a walkway

Where the value lives

A memory for the whole system

  1. Question 1 of 3

    What exists

    Every asset, with its technical data, in one record.

  2. Question 2 of 3

    Where it is

    Each asset in its place and in its network.

  3. Question 3 of 3

    What has happened to it

    Inspections, repairs and handovers, in order, each with its documents.

Start with one sample dataset

Bring a sample of your asset records and a clear standard for the result. We will turn it into a data production line you can measure, accept and grow.

Discuss a digitization challenge

  1. Pick a sample

    Choose one set of records that shows your usual mix.

  2. Fix the fields and rules

    Agree the data structure, the business rules and the fields that matter most.

  3. Agree what counts as done

    Set rules for missing or conflicting sources, and the checks the result must pass.

  4. Test before scaling

    Run a benchmark on the sample before full production.

This is a designed service, not a claim of a public deployment. It goes into production only after a sample of your records passes the benchmark and the acceptance checks.

Next industry pack

Enterprise

Turn document stores into data and operational knowledge.